Summary of Topics b0260_7_20071019_sum.htmlSubject 260
Bulletin Dated: October 19, 2007
SUMMARY OF TOPICS
The following changes in requirements are being proposed:
1. Revision of the Minimum Operating Pressure in the Operation Tests, Section 26; Hydraulic Friction Loss Test, Section 28; and in the Installation Instructions and Trim Drawings, Section 34