Subject 507
Bulletin Dated: May 5, 2008
SUMMARY OF TOPICS
The following is being proposed for preliminary review and comment only:
1. For Preliminary Review Only: Addition of a New Definition for Usable Normal Condition Regarding the Half-Wave Temperature Test.
2. For Preliminary Review Only: Replacement of the Test Voltages Table 31.1 with a Similar Table from UL 705.
3. For Preliminary Review Only: Addition of a New Footnote to Table 36.1 Regarding Motor Enclosure Temperatures for Industrial Air Circulators.
4. For Preliminary Review Only: Revisions to the Supply Cord Requirements to Clarify the Emery Cloth Specification, and to Indicate that All Five Samples Shall Comply With Abrasion, Pinching, and Crushing Testing.
5. For Preliminary Review Only: Clarification of Installation Instructions Related to the Exposure of Combustible Materials Within Ceiling Suspended Fan Outlet Boxes.
6. For Preliminary Review Only: Additional Requirements for Glass Used in Rangehoods.
7. For Preliminary Review Only: Clarification of Lamp Containment Barriers by Adding New Requirements.
8. For Preliminary Review Only: Additional Performance Requirements for Recessed Ceiling Fan/Lights to Include Test Criteria for Lamp Types other than Type A.
9. For Preliminary Review Only: Additional Requirements for Fans for Use in Windows.
10. For Preliminary Review Only: Additional Requirements for Portable Appliances Intended for Outdoor Use.
11. For Preliminary Review Only: Deletion of Downdraft Fan Flare-Up Test, Section 147.2.
12. For Preliminary Review Only: Deletion of the Canadian Requirements Comparison Guide (CRG).
13. For Preliminary Review Only: Miscellaneous Revisions.
14. For Preliminary Review Only: From 2008 STP Meeting - Addition of UL 50 Tests for Bending, Flexing and Torque Tests for Rigid Metal Conduit Connections.
15. For Preliminary Review Only: From 2008 STP Meeting - Correlation of UL 507 Ceiling Fan Outlet Box Markings with QCMZ.
16. For Preliminary Review Only: From 2008 STP Meeting - Clarification of Walls Used for Rangehood Testing.
17. For Preliminary Review Only: From 2008 STP Meeting - Cold Impact Testing of Guards.
18. For Preliminary Review Only: From 2008 STP Meeting - Modification of 91.3.1 to Reference Interconnecting Cords and Leads, Section 42A.
19. For Preliminary Review Only: From 2008 STP Meeting - Scope Revisions and Section Deletions Related to Movement of Inflator Requirements.
20. For Preliminary Review Only: From 2008 STP Meeting - Dryer Type Fan Markings and GFCI Requirements in 156B.1.1.