Standard 507, Edition 9
UL 507
SUPERSEDED

Standard for Electric Fans

UL CSDS Proposal
Published Date: May 05, 2008
Last Revision: January 25, 2017

$0.00

Summary of Topics b0507_9_20080505_sum.html

Subject 507

Bulletin Dated: May 5, 2008

SUMMARY OF TOPICS

The following is being proposed for preliminary review and comment only:

1. For Preliminary Review Only: Addition of a New Definition for Usable Normal Condition Regarding the Half-Wave Temperature Test.

2. For Preliminary Review Only: Replacement of the Test Voltages Table 31.1 with a Similar Table from UL 705.

3. For Preliminary Review Only: Addition of a New Footnote to Table 36.1 Regarding Motor Enclosure Temperatures for Industrial Air Circulators.

4. For Preliminary Review Only: Revisions to the Supply Cord Requirements to Clarify the Emery Cloth Specification, and to Indicate that All Five Samples Shall Comply With Abrasion, Pinching, and Crushing Testing.

5. For Preliminary Review Only: Clarification of Installation Instructions Related to the Exposure of Combustible Materials Within Ceiling Suspended Fan Outlet Boxes.

6. For Preliminary Review Only: Additional Requirements for Glass Used in Rangehoods.

7. For Preliminary Review Only: Clarification of Lamp Containment Barriers by Adding New Requirements.

8. For Preliminary Review Only: Additional Performance Requirements for Recessed Ceiling Fan/Lights to Include Test Criteria for Lamp Types other than Type A.

9. For Preliminary Review Only: Additional Requirements for Fans for Use in Windows.

10. For Preliminary Review Only: Additional Requirements for Portable Appliances Intended for Outdoor Use.

11. For Preliminary Review Only: Deletion of Downdraft Fan Flare-Up Test, Section 147.2.

12. For Preliminary Review Only: Deletion of the Canadian Requirements Comparison Guide (CRG).

13. For Preliminary Review Only: Miscellaneous Revisions.

14. For Preliminary Review Only: From 2008 STP Meeting - Addition of UL 50 Tests for Bending, Flexing and Torque Tests for Rigid Metal Conduit Connections.

15. For Preliminary Review Only: From 2008 STP Meeting - Correlation of UL 507 Ceiling Fan Outlet Box Markings with QCMZ.

16. For Preliminary Review Only: From 2008 STP Meeting - Clarification of Walls Used for Rangehood Testing.

17. For Preliminary Review Only: From 2008 STP Meeting - Cold Impact Testing of Guards.

18. For Preliminary Review Only: From 2008 STP Meeting - Modification of 91.3.1 to Reference Interconnecting Cords and Leads, Section 42A.

19. For Preliminary Review Only: From 2008 STP Meeting - Scope Revisions and Section Deletions Related to Movement of Inflator Requirements.

20. For Preliminary Review Only: From 2008 STP Meeting - Dryer Type Fan Markings and GFCI Requirements in 156B.1.1.

Back to Standard 507, Edition 9

The cost to purchase this Standard varies depending on whether you are ordering a hardcopy, PDF or combination of the two. We also offer two different types of subscriptions: a one year and a three year.

You will be able to choose your purchase options on the following pages.

×

The ULSE standard development process is under continuous maintenance, which means new work may already be in progress when a revision is published.

×
×
×
×
×

You have one or more subscriptions that will expire soon.

×

You have one or more licenses to assign

×

Additional information required

To serve you better, please update your account details.

Featured Standards


Recently Published











Coming Soon

UL 48
Electrical Signs
Revision Pages

UL/ULC 25
Meters for Flammable and Combustible Liquids and LP-Gas
Revision Pages

UL 155
Tests for Fire Resistance of Vault and File Room Doors
Revision Pages

UL 310
Electrical Quick-Connect Terminals
New Edition

UL 19
Lined Fire Hose and Hose Assemblies
Revision Pages

UL 104
Elevator Door Locking Devices and Door or Gate Closed Detection Means
New Edition

UL 217
Smoke Alarms
Revision Pages

UL 294
Access Control System Units
Revision Pages
×

Email Verification Required

To enhance security and protect our community from fraudulent activity, we require email address confirmation before orders can be placed. This step ensures that all orders come from verified sources, helping us maintain a safe and trusted environment for everyone. Thank you for your cooperation.

To resend the confirmation email please click here. The confirmation email will look like the sample below.

Sample

example email
×