Standard 325, Edition 5
Revision
February 25, 2010
UL 325
SUPERSEDED

ANSI/CAN/UL Standard for Door, Drapery, Gate, Louver, and Window Operators and Systems

UL Revision
Published Date: February 25, 2010
Last Revision: June 03, 2013

$502.00

Revisions and Related Documents

Revisions
Red Line Std. (14)

Date      
June 03, 2013 Revision
January 12, 2012 Revision
October 13, 2011 Revision
April 25, 2011 Revision
November 03, 2010 Revision
February 25, 2010 Revision
December 23, 2009 Revision
October 08, 2009 Revision
June 10, 2009 Revision
January 14, 2009 Revision
August 29, 2007 Revision
February 21, 2006 Revision
January 17, 2006 Revision
March 14, 2003 Revision
Showing 10 of XX
Show All

CSDS
Proposals (40)

CSDS Proposal   

CSDS Proposals

An electronic document associated with a UL Standard for Safety or Outline of Investigation, and issued by UL to propose:

  • A revision of a single or multiple requirement(s).
  • A complete new edition of an existing Standard or Outline.
  • A new Standard or Outline that has not previously been published.

CSDS Proposals provide access to view the proposal and submit comments within UL's Collaborative Standards Development System (CSDS) appropriately.

×

November 16, 2012
June 22, 2012
March 02, 2012
October 21, 2011
August 12, 2011
August 05, 2011
July 22, 2011
April 22, 2011
April 15, 2011
March 18, 2011
February 11, 2011
January 21, 2011
November 12, 2010
October 15, 2010
August 27, 2010
August 20, 2010
March 01, 2010
February 12, 2010
November 13, 2009
August 21, 2009
July 24, 2009
May 01, 2009
April 03, 2009
March 09, 2009
February 13, 2009
December 05, 2008
September 19, 2008
August 15, 2008
May 02, 2008
March 28, 2008
February 21, 2008
January 04, 2008
May 11, 2007
March 09, 2007
January 19, 2007
June 09, 2006
May 12, 2006
November 11, 2005
April 29, 2005
March 25, 2005
Showing 10 of XX
Show All

UL LLC CRD (6)

UL LLC - Certification Requirement Decision    Learn more about CRDs
May 16, 2012
May 15, 2012
March 15, 2011
October 01, 2009
September 19, 2008
January 02, 2008
Showing 10 of XX
Show All
Showing 10 of XX
Show All

Other Updates (6)

Showing 10 of XX
Show All
Bulletin   

Bulletins

These bulletins are not used in CSDS. These are announcement and report type bulletins.

×
Summary of Topics (SOT)
May 29, 2009 View
May 17, 2004 View
December 04, 2003 View
June 16, 2003 View
January 07, 2003 N/A
July 19, 2002 View
Showing 10 of XX
Show All
Showing 10 of XX
Show All
Showing 10 of XX
Show All
Showing 10 of XX
Show All
Showing 10 of XX
Show All

Referenced Standards (34)

Below is a list of UL Standards referenced in UL 325

StandardEditionTitle
13 4 Power-Limited Circuit Cables
101 6 Leakage Current for Utilization Equipment
157 3 Gaskets and Seals
244A 3 Standard for Solid-State Controls for Appliances
305 6 Panic Hardware
310 10 Electrical Quick-Connect Terminals
498 16 Attachment Plugs and Receptacles
508 19 Standard for Industrial Control Equipment
746C 7 Polymeric Materials - Use in Electrical Equipment Evaluations
796 12 Printed Wiring Boards
935 10 Fluorescent-Lamp Ballasts
969 6 Marking and Labeling Systems
991 3 Tests for Safety-Related Controls Employing Solid-State Devices
1029 5 High-Intensity-Discharge Lamp Ballasts
1310 7 Class 2 Power Units
1434 1 Thermistor-Type Devices
1446 8 Systems of Insulating Materials - General
1557 7 Electrically Isolated Semiconductor Devices
1577 5 Optical Isolators
1998 3 Software in Programmable Components
2111 1 Standard for Overheating Protection for Motors
2353 3 Single- and Multi-Layer Insulated Winding Wire
8750 2 Light Emitting Diode (LED) Equipment for Use in Lighting Products
1004-1 2 Rotating Electrical Machines - General Requirements
1004-3 2 Thermally Protected Motors
1004-7 3 Electronically Protected Motors
5085-1 1 Low Voltage Transformers - Part 1: General Requirements
5085-3 1 Low Voltage Transformers - Part 3: Class 2 and Class 3 Transformers
60065 8 Standard for Audio, Video and Similar Electronic Apparatus - Safety Requirements
60335-1 7 Household and Similar Electrical Appliances - Safety - Part 1: General Requirements
60730-1 6 Automatic Electrical Controls - Part 1: General Requirements
60950-1 2 Information Technology Equipment - Safety - Part 1: General Requirements
60384-14 3 Fixed Capacitors for Use In Electronic Equipment - Part 14: Sectional Specification - Fixed Capacitors for Electromagnetic Interference Suppression and Connection to the Supply Mains
61800-5-1 2 Adjustable Speed Electrical Power Drive Systems - Part 5-1: Safety Requirements - Electrical, Thermal and Energy
Showing 10 of XX
Show All

Reverse Referenced Standards (3)

UL 325 is referenced in the following list of UL Standards

Showing 10 of XX
Show All

The cost to purchase this Standard varies depending on whether you are ordering a hardcopy, PDF or combination of the two. We also offer two different types of subscriptions: a one year and a three year.

You will be able to choose your purchase options on the following pages.

×

The ULSE standard development process is under continuous maintenance, which means new work may already be in progress when a revision is published.

×
×
×
×
×

You have one or more subscriptions that will expire soon.

×

You have one or more licenses to assign

×

Additional information required

To serve you better, please update your account details.

Featured Standards


Recently Published











Coming Soon

UL 48
Electrical Signs
Revision Pages

UL/ULC 25
Meters for Flammable and Combustible Liquids and LP-Gas
Revision Pages

UL 155
Tests for Fire Resistance of Vault and File Room Doors
Revision Pages

UL 310
Electrical Quick-Connect Terminals
New Edition

UL 19
Lined Fire Hose and Hose Assemblies
Revision Pages

UL 104
Elevator Door Locking Devices and Door or Gate Closed Detection Means
New Edition

UL 217
Smoke Alarms
Revision Pages

UL 294
Access Control System Units
Revision Pages
×

Email Verification Required

To enhance security and protect our community from fraudulent activity, we require email address confirmation before orders can be placed. This step ensures that all orders come from verified sources, helping us maintain a safe and trusted environment for everyone. Thank you for your cooperation.

To resend the confirmation email please click here. The confirmation email will look like the sample below.

Sample

example email
×