Standard 2388, Edition 1
UL 2388
SUPERSEDED

Flexible Lighting Products

UL Bulletin
Published Date: October 29, 2003
Last Revision: May 19, 2014

$314.00-$391.00

Summary of Topics m0588_18,2388_1,_20031029_sum.html

Subjects 588 (2388)

Bulletin Dated: October 29, 2003

The following topics were discussed at the meeting:

SUMMARY OF TOPICS

UL 2388

1) Revision of scope of UL 2388

2) Revision of flammability rating in paragraph 7.2 (STP member proposal)

3) Revision of temperature rating of polymeric materials in paragraph 7.9 (STP member proposal)

4) Clarification of AWG requirements for stranded conductors

5) Addition of fusing requirements to Table 14.1

6) Revision to clarify requirements in paragraph 23.1 (STP member proposal)

7) Clarification of the Normal Temperature Test, Section 23

8) Clarification of test procedures in the Abnormal Temperature Test, Section 24

9) Proposed revisions to the test for Permanence of Cord Tag, Section 36

10) Proposed deletion of dielectric test requirements from the Rain Test, Section 35

11) Addition of requirements for gaskets

12) Miscellaneous revisions

13) Clarification of the Insulation Resistance Test, Section 25

14) Clarification of requirements for polymeric materials employed as an enclosure of a flexible lighting product

15) Discussion regarding the polymer industry and comparison of UL 2388 with CSA requirements

16) Discussion of requirements for non-extendable flexible lighting products

17) Discussion of requirements permitting field modification of Class 2 flexible lighting products

18) Flexible lighting products that employ a Class 2 transformer or Light Emitting Diodes (LEDs)

UL 588

19) Lighting string constructions employing single CXTW wire and integral parallel construction

20) Revisions to the rain test

21) Clarification of load fitting requirements for decorative outfits employing medium-base lampholders

22) Clarification of the trip current in the dielectric voltage-withstand test

23) Revisions to requirements for Ratings, Section 113

24) Comment resolution for Item # 1 of UL Subject 588 Bulletin (Revision of paragraph 22.2.1.1), dated April 22, 2003

25) Proposed requirements for motorized ornaments

26) Update on fiber-optic products

27) Discussion of Patent Issues

28) Miscellaneous revisions

29) Proposal to eliminate portable lamps with seasonal decorations from UL 588 (STP member proposal)

30) Addition of strain relief requirements for ornaments

31) Revision of requirements for ornaments (STP member proposal)

32) Addition of requirements for tree stands

33) Discussion of new requirements to address the use of "screw-on" connectors presently used in UL 2388 products used as a means to connect UL 588 lighting strings

34) New requirements for multifunctional electrical lampholder contacts

35) Revisions to the scope to eliminate nightlights and flexible lighting products

36) Additional packaging warnings (STP member proposal)

Revisions and Related Documents

Revisions
Red Line Std. (11)

Date      
May 19, 2014 Redline Revision
March 31, 2014 Revision
January 11, 2010 Revision
September 22, 2009 Revision
May 29, 2008 Revision
December 20, 2006 Revision
February 11, 2005 Revision
June 28, 2004 Revision
May 26, 2003 Revision
September 27, 2002 Revision
Showing 10 of XX
Show All

CSDS
Proposals (14)

CSDS Proposal   

CSDS Proposals

An electronic document associated with a UL Standard for Safety or Outline of Investigation, and issued by UL to propose:

  • A revision of a single or multiple requirement(s).
  • A complete new edition of an existing Standard or Outline.
  • A new Standard or Outline that has not previously been published.

CSDS Proposals provide access to view the proposal and submit comments within UL's Collaborative Standards Development System (CSDS) appropriately.

×

August 26, 2016
April 14, 2016
March 07, 2014
January 24, 2014
January 18, 2013
December 07, 2012
July 03, 2009
March 30, 2009
June 01, 2007
January 31, 2007
July 28, 2006
March 10, 2006
December 16, 2005
December 17, 2004
Showing 10 of XX
Show All

UL LLC CRD (2)

UL LLC - Certification Requirement Decision    Learn more about CRDs
January 08, 2016
November 19, 2012
Showing 10 of XX
Show All
Showing 10 of XX
Show All

Other Updates (8)

Showing 10 of XX
Show All
Bulletin   

Bulletins

These bulletins are not used in CSDS. These are announcement and report type bulletins.

×
Summary of Topics (SOT)
March 10, 2017 View
February 14, 2008 View
October 29, 2003 View
February 11, 2003 N/A
August 19, 2002 N/A
July 08, 2002 View
October 31, 2001 N/A
March 21, 2001 N/A
Showing 10 of XX
Show All
Showing 10 of XX
Show All
Showing 10 of XX
Show All
Showing 10 of XX
Show All
Showing 10 of XX
Show All

Referenced Standards (17)

Reverse Referenced Standards (2)

UL 2388 is referenced in the following list of UL Standards

Showing 10 of XX
Show All

The cost to purchase this Standard varies depending on whether you are ordering a hardcopy, PDF or combination of the two. We also offer two different types of subscriptions: a one year and a three year.

You will be able to choose your purchase options on the following pages.

×

The ULSE standard development process is under continuous maintenance, which means new work may already be in progress when a revision is published.

×
×
×
×
×

You have one or more subscriptions that will expire soon.

×

You have one or more licenses to assign

×

Additional information required

To serve you better, please update your account details.

Featured Standards


Recently Published











Coming Soon

UL 48
Electrical Signs
Revision Pages

UL/ULC 25
Meters for Flammable and Combustible Liquids and LP-Gas
Revision Pages

UL 155
Tests for Fire Resistance of Vault and File Room Doors
Revision Pages

UL 310
Electrical Quick-Connect Terminals
New Edition

UL 19
Lined Fire Hose and Hose Assemblies
Revision Pages

UL 104
Elevator Door Locking Devices and Door or Gate Closed Detection Means
New Edition

UL 217
Smoke Alarms
Revision Pages

UL 294
Access Control System Units
Revision Pages
×

Email Verification Required

To enhance security and protect our community from fraudulent activity, we require email address confirmation before orders can be placed. This step ensures that all orders come from verified sources, helping us maintain a safe and trusted environment for everyone. Thank you for your cooperation.

To resend the confirmation email please click here. The confirmation email will look like the sample below.

Sample

example email
×