Summary of Topics u529_5_20251030_sum.htmlSummary of Topics
This revision of CAN/ULC 529 dated October 30, 2025 includes the following changes in requirements:
– Field Testing with Integral Self-Test; 3.1A, 77.1 (title), 77.1.1, 77.1.2, and Section 77.4
– Control Unit Interface – Normal Operation; 30.1.8