Summary of Topics s827_9_sum.htmlSummary of Topics
This revision of ANSI/UL 827 dated May 14, 2025 replaces the revision dated May 12, 2025. Sections 37 – 39 were inadvertently deleted from the Standard and need to be added back in. These sections were in Topic 1 of the August 30, 2024 proposal bulletin and this topic failed during ballot.
The May 12, 2025 revisions included changes in the following requirements which are noted for reference:
– Remove Permanent Work from Home; Sections 37 – 39 (added back in with the May 14, 2025 revisions)
– Contracted Central-station Operators; 5.2.41, 18.3.2
– Remove (Informative) Annex F and references to Annex F in UL 827; 1.1, 1.5, 1.6, 5.2.22, 5.2.45, Table 17.5, 18.1 – 18.6, 19.1 – 19.5, 19.8.2.2, 20.1.2, 20.11.1.1, 20.2 – 20.5, Section 21, 25.3, Section 30, Annex F (deleted)
– Editorial clean up; 14.1, 14A.1, 14.13A, 14.14A, 17.4.2